FERC Filings
MOTION FOR LEAVE TO INTERVENE AND COMMENTS OF THE ELECTRIC POWER SUPPLY ASSOCIATION re: RELIANT ENERGY MID-ATLANTIC POWER HOLDINGS, L.L.C. v. PJM INTERCONNECTION, L.L.C.
INTRODUCTION
Reliant Energy Mid-Atlantic Power Holdings, LLC
Complainant,
v.
PJM Interconnection, LLC
Respondent.
Docket No. EL03-116-000
Pursuant to Rules 212 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (FERC or Commission), 18 C.F.R. §§ 385.212 and 214, the Electric Power Supply Association (EPSA) hereby requests leave to intervene and comment in the complaint filed in the above-captioned proceeding.
