MOTION TO INTERVENE AND PROTEST OF ELECTRIC POWER SUPPLY ASSOCIATION -Southwest Power Pool, Inc. - Docket No. RT01-34-000
- I. MOTION TO INTERVENE
- II. PROTEST
- C. Congestion Management
- E. The RTO Proposal Violates Order No. 2000’s Rule with Respect to the Transmission Owner’s Control over Rate Methodology
- F. Interconnection
- III. CONCLUSION
- Introduction
- A. The SPP Proposal Contains Excessive Grandfathering Of Existing Transmission Uses, Including Native Load Growth, Such That No Comparable Open Access Will Be Provided In The Foreseeable Future.
- B. The RTO Proposal Violates The Rule of Comparability Announced in Order 888
- D. The RTO’s Proposed Governance Structure is Unmanageable and Unfairly Weighted Towards Transmission Owners